Sonship in Servitude
Manage episode 427425729 series 3267403
John 5:19
Then answered Jesus and said unto them, Verily, verily, I say unto you, The Son can do nothing of himself, but what he seeth the Father do: for what things soever he doeth, these also doeth the Son likewise.
285 епізодів